24 Points checklist





  A B C
   1.  LIFT PUMP CLEAN CHECK SERIAL NUMBER.      
   2.  EXAMINE STATOR HOUSING FOR WATER.      
   3.  EXAMINE OIL HOUSING FOR WATER.      
   4.  CHECK IMPELLAR FOR WEAR.      
   5.  EXAMINE WEAR RING.      
   6.  CHECK VOLUTE/STRAINER.      
   7.  ASSESS BEARING CONDITION.      
   8.  CHECK LIFTING CHAIN AND CABLES.      
   9.  CHECK OPERATIONS OF REFLUX VALVES.      
  10. CHECK CONDITION OF PIPEWORK.      
  11. MEGGAR CABLE RECORD READING.      
  12. CHECK OVERLOAD SETTING (RECORD).      
  13. RECORD EARTH LOOP RESISTANCE.      
  14. CHECK SYSTEM OPERATION.      
  15. CLEAN CONTROL PANEL.      
  16. CHECK FUSES FOR SECURITY.      
  17. CHECK OPERATION OF HEATER.      
  18. CHECK / REPLACE INDICATORS.      
  19. CHECK ALARM OPERATIONS.      
  20. CHECK / CLEAN FLOATS.      
  21. CLEAN KIOSK INSIDE AND OUT.      
  22. CHECK INSTALLATION FOR DAMAGE.      
  23. CHECK INSTALLATION FOR SECURITY.      
  24. CHECK SUMP CONDITION (REPORT).      
A = O.K.  B = SEVICEABLE  C = FAILED